翻訳と辞書
Words near each other
・ J. Paul Getty Award for Conservation Leadership
・ J. Paul Getty Museum
・ J. Paul Getty Trust
・ J. Paul Hogan
・ J. Paul Marion
・ J. Paul Oetken
・ J. Paul Raines
・ J. Paul Reason
・ J. Paul Reddam
・ J. Paul Taylor
・ J. Pearl
・ J. Pemberton (MCC cricketer)
・ J. Peppercorn (MCC cricketer)
・ J. Percy Bruce
・ J. Percy Page High School
J. Percy Priest Dam
・ J. Percy Ross
・ J. Perry
・ J. Peter Burgess
・ J. Peter Grace
・ J. Peter Kincaid
・ J. Peter Lesley House
・ J. Peter May
・ J. Peter Neary
・ J. Peter Robinson
・ J. Peter Sartain
・ J. Peter Schwalm
・ J. Peterman
・ J. Peters
・ J. Ph. Vogel


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

J. Percy Priest Dam : ウィキペディア英語版
J. Percy Priest Dam

J. Percy Priest Dam is a dam in north central Tennessee at river mile 6.8 of the Stones River, a tributary of the Cumberland. It is located about ten miles (16 km) east of downtown Nashville. The reservoir behind the dam is Percy Priest Lake. It is one of four major flood control reservoirs for the Cumberland; the others being Wolf Creek Dam, Dale Hollow Dam, and Center Hill Dam.
The Flood Control Act of 1946 commissioned the construction of a project under the name “Stewarts Ferry Reservoir”. Public Law 85-496, approved July 2, 1958, changed the name to J. Percy Priest in honor of the late Congressman from Tennessee.〔(Dates in Nashville District History ), U.S. Army Corps of Engineers Nashville District website, accessed August 11, 2009〕 Construction began June 2, 1963 and the dam was completed in 1968. The dam was built under U.S. Army Corps of Engineers supervision.
In 1979 the dam was bombed with dynamite as ruse to cover a crime spree supposed to have taken place in the resultant massive flooding. The conspirators succeeded only in destroying some iron doors at the dam's base. The suspects were later convicted and sentenced to substantial prison terms.〔(''Reading Eagle'', January 7, 1979 )〕
Rising above the streambed, the combination earth and concrete-gravity dam is long with a hydroelectric power plant generating 28 MW of electrical power. The dam has contributed significantly in reducing the frequency and severity of flooding in the Cumberland Valley. In addition to the far-reaching effects of flood control, the project contributes to the available electric power supply of the area.
The dam is easily visible from Interstate 40 where it crosses the Stones River.
The completion of the dam in 1967 resulted in the destruction of the last known population of the freshwater mussel ''Epioblasma lenior'', which is now extinct. 〔Parmalee, P. W., & Bogan, A. E. (1998). Freshwater mussels of Tennessee.〕
==Reservoir Elevation (behind the dam)==

(elevations are in feet above sea level)
504.50 ft The dam can hold flood waters up to this level
494.50 ft Elm Hill Marina begins to flood by surpassing the individual walkways to the boat docks
494.50 ft Hamilton Creek Sailboat Marina begins to flood by surpassing the primary walkway to the sailboat docks
490.00 ft Summer Pool (April to October)
483.00 ft Winter Pool (November to March)
480.00 ft Permanent Pool


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「J. Percy Priest Dam」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.